The craftsmanship was exceptional and the speed of installation was impressive…

Le Mark’s Meadow Sprung Floor at Peterborough Conservative Club

Client: Peterborough Conservative Club

Client Brief:

  • Provide a high quality wooden sprung floor
  • Fully installed
  • Safe and seamless finish with side ramps for health & safety

Installed Product: Meadow Sprung Dance Floor

“We were in need of replacing our dance floor for some time and we found Le Mark through the Internet. For us, the stress was on quality and the ability to deliver” explained Andy Sanders from the Peterborough Conservative Club.

Wanting the floor to be installed as soon as possible, it took around three weeks (from point of order to delivery) for Le Mark to get the flooring manufactured and delivered, with installation taking place on the same day as delivery.

Andy required the wooden sprung floor to be positioned away from the walls so oak ramps had to be placed around the perimeter of the floor for a seamless finish, as well as for health and safety purposes.

“The craftsmanship was exceptional and the speed of installation was impressive; it took under eight hours for the floor to be installed so we were able to conduct normal business the same evening!”

When asked why they chose Le Mark, Andy had this to say:

“We were drawn to Le Mark by its link to the London Olympics and, for us, their local presence, and their value for money. The response from our members has been outstandingly positive. A great company to do business with.”

Peterborough Conservative Club is a long standing institution in Peterborough which has attracted an effective and passionate membership. Being non-political, and focusing on providing a variety of entertainment and facilities for our members, its aim is to include the best in weekend entertainment which involves a great deal of dance floor usage.